WELCOME TO Néré Mining

BURKINA FASO

The Néré Mining is a low-grade heap leach operation and consists of several gold deposits which are shallow, open pittable with little blasting required and a low strip ratio. In 2017, an optimization project was completed to lift the stacking capacity. .

Keys facts

Ownership:

90% NM,10% Government of Burkina Faso

Start date:

2016

Mining Method:

Open Pit/Contractor Mining

Technology:

Heap Leachg

Expected mine life:

5-7 years

Workforce:

Approximately 1,559

OPERATING PERFORMANCE

Operational Data FY-16 FY-17 FY-18 FY-19 FY-20
Mining
Waste - open pit (kt) 6,874 11,451 12,217 15,690 14,377
Ore Mined - open pit (kt) 1,879 3,862 4,715 3,745 4,781
Processing
Ore Processed (kt) 2,089 3,552 4,097 4,196 4,871
Grade (g/t) 1.16 1.07 0.95 0.91 0.84
Recovery (%) 90 83 82 82 77
Production (oz) 61,813 97,982 108,773 96,534 98,185
Cash Cost Details
Cash cost per ounce sold (US$/oz) 657 716 704 783 ~820
All-in Sustaining Costs (US$/oz) 738 834 813 903 ~1,010

ESG DATA CENTER

Key Metrics FY-17 FY-18 FY-19
Safety & Health
Fatalities 0 0 0
Lost Time Injuries 1 0 0
Energy
Energy Consumption (MWh) 160,295 182,162 173,948
Energy Intensity (kWh/t of production) 45 59 12
GHG Emissions (tCO2e) 39,789 44,917 50,159
GHG Emissions Intensity (kgCO2e/t of production) 11 15 3
Water
Water Consumption (ML) - 179 374
Key Metrics FY-17 FY-18 FY-19
Safety & Health
Fatalities 0 0 0
Lost Time Injuries 1 0 0
Energy
Energy Consumption (MWh) 160,295 182,162 173,948
Energy Intensity (kWh/t of production) 45 59 12
GHG Emissions (tCO2e) 39,789 44,917 50,159
GHG Emissions Intensity (kgCO2e/t of production) 11 15 3
Water
Water Consumption (ML) - 179 374
Key Metrics FY-17 FY-18 FY-19
Safety & Health
Fatalities 0 0 0
Lost Time Injuries 1 0 0
Energy
Energy Consumption (MWh) 160,295 182,162 173,948
Energy Intensity (kWh/t of production) 45 59 12
GHG Emissions (tCO2e) 39,789 44,917 50,159
GHG Emissions Intensity (kgCO2e/t of production) 11 15 3
Water
Water Consumption (ML) - 179 374

RESERVES AND RESOURCES

On a 100% basis. Resources shown inclusive of Reserves. Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 0.3 0.40 4
Probable Reserves 5.2 0.93 154
P&P Reserves 5.5 0.90 158
Measured Resource (incl of reserves) 0.3 0.40 4
Indicated Resources (incl of reserves) 47.7 1.24 1,894
M&I Resources (incl of reserves) 48.0 1.23 1,898
Inferred Resources 16.2 1.30 679